What's Included

Here's what we deliver when you engage us for 6D BIM integration.

Intelligent Asset Data

Embed maintenance schedules, warranty information, and operational specifications directly into BIM elements for seamless facility handover.

Sustainability Analysis

Track energy consumption, carbon footprint, and environmental performance metrics throughout the building lifecycle.

Lifecycle Cost Planning

Forecast long-term operational expenses, replacement cycles, and maintenance budgets for informed asset management decisions.

How it Works

Our 6D BIM Process

How we integrate facilities management data into your BIM models.

1

Data Collection

We gather equipment specifications, O&M manuals, BIM models, CAD documents from your facility team and consultants. Where 3D information is missing, we can use Scan to BIM to capture existing conditions.

2

BIM Data Integration

Our specialists embed asset data, sustainability metrics, and maintenance schedules into the BIM model using COBie standards and FM-ready formats.

3

FM Platform Handover

We deliver the 6D BIM model with integrated facility data, ready for import into CAFM/CMMS platforms for ongoing asset management.

6D Asset Management Software

We integrate BIM models with facilities management and sustainability software for comprehensive asset lifecycle management.

Autodesk
Revit
Navisworks
Bentley Infrastructure Cloud
COBie

6D BIM Workflows

How we integrate operational intelligence into your BIM models.

Section image

Smart Asset Documentation

Embed COBie-compliant data into BIM elements including equipment specifications, maintenance requirements, and warranty details. Generate facility handover packages with complete operational intelligence.

Section image

Energy & Sustainability Metrics

Integrate energy analysis data, carbon calculations, and environmental certifications (Green Mark, LEED) into the BIM model for comprehensive sustainability reporting and compliance.

Section image

Multi-site Facility Management

Manage facilities across multiple sites through integrated BIM and geospatial platforms. Track maintenance events by location, identify problematic assets across portfolios, and access real-time operational data for faster response and resolution.

Frequently Asked Questions

What is 6D BIM and how is it different from 5D BIM?

5D BIM focuses on construction cost and schedule. 6D BIM extends this to facilities management, adding operational data like maintenance schedules, energy performance, and asset lifecycle information.

Do you follow COBie standards for facility data?

Yes, we structure facility data using COBie (Construction Operations Building Information Exchange) standards to ensure compatibility with CAFM/CMMS platforms.

Can you integrate sustainability certifications like Green Mark?

We can embed sustainability metrics, energy analysis data, and certification requirements (Green Mark, LEED, BREEAM) into the 6D BIM model for compliance tracking and reporting.

What software platforms can receive the 6D BIM data?

Our 6D BIM models can export to common CAFM/CMMS platforms including Archibus, IBM Maximo, and FM:Systems. We also provide data in COBie Excel format for platform-agnostic handover.

How is BIM used for facility management?

BIM is combined with asset data that typically exists in PDF format. This includes information like manufacturer details, equipment installation dates, next service dates, and project specifications such as power requirements. This is known as a 6D BIM model, and FM teams can readily pull out information on any asset directly from the 3D model. When used with a solution like Autodesk Tandem, the 6D BIM model can also be linked to the original 2D documentation for further reference.

How do BIM and IoT work together for facility management?

A solution like Autodesk Tandem allows the visual BIM model to be connected to live sensor data. Sensors stream real-time readings such as temperature, humidity, and energy consumption into the BIM model, which can then be visualized over the web. This gives facility managers a real-time digital twin of their building, enabling them to monitor conditions, detect anomalies, and make data-driven maintenance decisions without needing to be on-site.

From Our Clients

Highly recommended — skilled team, always on time, and great at solving 3D model issues fast.

John Lester Baconawa

Senior Project Engineer

Peak Top Engineering Pte Ltd

MEP Coordination

Excellent service — responsive, technically strong, and delivered on time consistently.

Masita Deei

Technical Project Manager

Vector Foiltec Pte Ltd

BIM Modeling

Outstanding quality and turnaround time. Excellent technical advice and very prompt responses.

Princess Rogando

Design Engineer

Concord Corporation Pte Ltd

Structural BIM

Good quality of advice, timely follow-up, and solid deliverables. Service met our expectations.

Chris

Manager

KEEHANS PTE LTD

BIM Coordination

Ben is very helpful and professional. Great experience working with the Bimeco team.

Kurita - Yanping

Manager

Kurita Singapore

BIM Services

Expert BIM Consultants

With a network of more than 200 BIM specialists, we integrate facilities management intelligence into your digital asset delivery.